 |
|

The Steeles Technology Campus (SteelesTech) is located
on the south side of Steeles Avenue East between Highway
404 and Victoria Park Avenue in the City of Toronto.
The Steeles Technology Campus is a planned 1.3 million
square foot technology office park comprising two existing
buildings, two recently completed buildings, 3381 and
3389 Steeles Avenue East, being Phases I and II, respectively
and one planned for future development. Phases I and II
are a four-story, 175,000 square foot low rise office
facility (3381 Steeles) and an 11-story, 330,000 square
foot office tower (3389 Steeles). Now available for pre-leasing,
the third building currently planned incorporates materials,
features and benefits consistent with Phases I and II.
This third building will be a design build which can be
sized according to the requirements of the tenant but
will be at least 250,000 sq.ft.
The project was designed for occupancy by a major telecommunications
company and as a result not only has 'A' Class attributes
exceeding those found in competitive projects, but also
has state of the art high-tech enhancements in the areas
of design and life safety, heating ventilation, and air-conditioning
(HVAC), power and distribution and of course telecommunications.
These specialized features are rarely available in speculative
multi-tenant developments in the Toronto marketplace.
On-site amenities include an abundance of underground
heated and surface parking for tenants and visitors, a
Car Wash, a Good Life Fitness Centre, a Tim Horton’s
and a day care facility, Kids & Company.
A wide range of amenities are located in the immediate
area. These include hotels and conference facilities,
financial institutions with business banking, full service
restaurants and fast food, retail shopping, convenience
stores, gas stations, child-care and fitness facilities.
Another amenity of SteelesTech is the Toronto public transit
system. There are four separate routes that presently
service SteelesTech two of which connect to the Yonge
Street Subway at the Finch Station, one which connects
to the new Sheppard Subway Line at the Don Mills Station
and the fourth which connects to the Bloor-Danforth Subway
Line at the Victoria Park Station. The complex has excellent
access to Highways 404, 401, and 407, with approximate
25 minute travel times to both downtown Toronto and the
Pearson International Airport.
The Steeles Technology Campus is the only office campus
in the Greater Toronto Area offering this vast array of
features and desired benefits. |
|
|
 |
|
bentall kennedy
Founded in 1911, Bentall Kennedy is Canada's largest real estate
investment fiduciary and property services organization.
Privately owned by senior management, SITQ and bcIMC,
Bentall Kennedy operates two fully integrated business lines -
real estate investment management and real estate services,
including property management, leasing and development
services. We have a majority interest in Kennedy Associates
Real Estate Counsel, Inc., the largest independent US
real estate advisory firm.
Bentall Kennedy manages over $17 billion in assets, which is over
76 million square feet in property managed directly by
Bentall Kennedy for its clients. We employ 1100 people across
Canada and the US in our offices in Vancouver, Calgary,
Edmonton, Winnipeg, Toronto, Ottawa, Montréal and Seattle.
Bentall Kennedy provides real estate management solutions to over
90 institutional clients in Canada and the U.S.
|
|
|
|
ownership
SITQ Immobilier is the owner of this development. The
property is managed and leased by Bentall Kennedy. Bentall Kennedy
is a growth-oriented real estate company with 90 years
of history and experience in the real estate industry
both in Canada and the USA. Additional information on
Bentall Kennedy can be obtained by visiting www.bentallkennedy.com.
Information on SITQ Immobilier is available
at www.sitq.com
|
|
|
|
architects
The Steeles Technology Campus was designed as a collaborative
effort of both Shore Tilbe Irwin and Partners in Canada
and the Hillier Group in the US. More information on the
Hillier Group is available at www.hillier.com.
Major projects with which Shore Tilbe Irwin have been
involved include: Head Office facilities for Canada Life
Assurance Co., Canadian Head Office of Hewlett Packard
Company, Metropolitan Toronto Police Headquarters, and
Bell Canada Regional Head Office.
|
|
|
|
consultants
Structural: Read Jones Christopherson www.rjc.ca
Mechanical: The Mitchell Partnership Inc www.tmptoronto.com
Electrical: H.H. Angus and Associates www.hhangus.com
Life Safety: Leber Rubes www.leber-rubes.com
|
|
|